3 december

Characterization and assessment of district heating flexibility

In heat and cold generation, machinery is usually operated to fulfil the instantaneous heat demand. This is not the most optimal way of operation and production flexibility can significantly increase the economic profits of a power plant. In the Flexi-Sync project, an increased district energy flexibility is demonstrated at six different pilots. One of these six pilots is located in Palma de Mallorca, Spain. During the webinar, the strategies to increase the energy flexibility of the Spanish demo site will be explained.